top of page

Upper Balephi Khola Hydropower Project

 

Name

Upper Balephi Khola Hydropower Project

Location

Nepal, Sindhupalchowk District (Balephi Khola River)

Capacity

45MW

Generation

265.2GWh

Cost

USD 79,395,000

 

Civil Work

Diversion Weir-40mL x 3.5mH

Spill Way-40mL x 3.5mH (Uncontrolled Ogee Shaped)

Intake Channel-3.0mW x 2.0mH x 3Set (Orifice Type)

Desanding Basin-120mL x 6mW x 7mHe x 2Set

Headrace Tunnel-4.83km x Φ2.5mD (Inverted D-shaped)

Surge Tank-Φ12mD x 43mH (Underground)

Inclined Shaft-Φ2.5mD x 441.2mL

Penstock Manifold-Φ1.2mD x 28.8mL

Powerhouse-23.3mL x 11.0mW x 18.9mH (Underground)

Tailrace Tunnel-144mL x 3mW x 3mH (Box Canal)

 

Electro Mechanical Equipment

Turbine-22MW x 2sets (Pelton Vertical)

Install Capacity-45MW

Energy Generated-265.2GWh

(Dry Season 46.2GWh/year, Wet Season 218.9)

Transmission Line-32km (132kV)

 

 

 

 

 

 

 

Project Information(contd.)

 

 

 

 

General Layout

Layout(Headworks Arrangement)

Financial Indicators

 

Return on Equity(RoE)

18.94%

Benefit Cost Ratio(B/C)

1.27

Construction of Civil and E&M Works Period

3 Years

License and License Renewal Fee

​​​​© 2015 by Hubicon. Created with Hubicon

CONNECT WITH US:

  • facebook-square
  • Twitter Square
bottom of page