Tila HydroPower Project #2
Name
Tila Hydroelectric Project 2
Location
Nepal, Kalikot (Tila River)
Capacity
420MW (105MW x 4Set)
Generation
1,723GWh(46.8%)
Cost
USD 534.8M
Civil Work
DAM-74mH x 203.4mL
Feeder Tunnel-Φ4.1mD x (151, 186)mL x 2nos
Desilting Basin-260mL x 11mW x 17.5mH x 2chamber
Headrace Tunnel-13.44km (Φ5.5mD, Horse Shoe Shape)
Surge Shaft-Φ10mD x 103mH
Pressure Shaft-Φ2.85mD x 828mL x 2nos
Powerhouse Cavern-19.5mL x 125.5mW x 42.5mH
Transformer Hall-15.5mL x 119mW x 21.2mH
Collection Gallery-N/A
Tailrace Tunnel-186mL x 6mW x 5mH (D-shape)
Electro Mechanical Equipment
Turbine-105MW x 4Set (Pelton, 375rpm)
Install Capacity-420MW
Energy Generated-1,723GW (46.8%)
Transmission Line-15km(220KV to Tila-1)
Layout









Financial IRR
17.01%
FIRR Equity
26.23%
Benefit / Cost Ratio
1.57
Preliminary Works
2.0 Year
Construction of Civil and E&M Works Period
4.5 Years