Tila HydroPower Project #1
Name
Tila Hydroelectric Project
Location
Nepal, Kalikot (Tila River)
Capacity
440MW (110MW x 4Set)
Generation
1,780GWh(46.2%)
Cost
USD 620.1M
Civil Work
DAM-9mH x 182.4mL
Feeder Tunnel-Φ4.4mD x (153.5, 195.5)mL x 2nos
Desilting Basin-290mL x 12mW x 18.8mH x 2chamber
Headrace Tunnel-13.77km (Φ6mD, Horse Shoe Shape)
Surge Shaft-Φ10mD x 128mH
Pressure Shaft-Φ3.25mD x 847mL x 2nos
Powerhouse Cavern-18mL x 120mW x 44mH
Transformer Hall-16mL x 122mW x 40mH
Collection Gallery-15.5mL x 65mW x 16mH
Tailrace Tunnel-642mL x 7mW x 7mH (D-shape)
Electro Mechanical Equipment
Turbine-110MW x 4Set (Francis Vertical, 500rpm)
Install Capacity-440MW
Energy Generated-1,780GW (46.2%)
Transmission Line-175km (220KV to Nepalganj)
Layout









Financial IRR
15.57%
FIRR Equity
27.75%
Benefit / Cost Ratio
1.46
Preliminary Works
2.0 Year
Construction of Civil and E&M Works Period
4.5 Years