Tila HydroPower Project #1

 

Name

Tila Hydroelectric Project

Location

Nepal, Kalikot (Tila River)

Capacity

440MW (110MW x 4Set)

Generation

1,780GWh(46.2%)

Cost

USD 620.1M

 

Civil Work

DAM-9mH x 182.4mL

Feeder Tunnel-Φ4.4mD x (153.5, 195.5)mL x 2nos

Desilting Basin-290mL x 12mW x 18.8mH x 2chamber

Headrace Tunnel-13.77km (Φ6mD, Horse Shoe Shape)

Surge Shaft-Φ10mD x 128mH

Pressure Shaft-Φ3.25mD x 847mL x 2nos

Powerhouse Cavern-18mL x 120mW x 44mH

Transformer  Hall-16mL x 122mW x 40mH

Collection Gallery-15.5mL x 65mW x 16mH

Tailrace Tunnel-642mL x 7mW x 7mH (D-shape)

 

Electro Mechanical Equipment

Turbine-110MW x 4Set (Francis Vertical, 500rpm)

Install Capacity-440MW

Energy Generated-1,780GW (46.2%)

Transmission Line-175km (220KV to Nepalganj)

 

Layout

 

 

 

 

 

Tila-1

Financial IRR

15.57%

 

FIRR Equity

27.75%

 

Benefit / Cost Ratio

1.46

Preliminary Works

2.0 Year

 

Construction of Civil and E&M Works Period

4.5 Years