top of page

KANTIPUR Solar power plant

 

Name of Project

 KANTIPUR Solar Power Plant

Region

 Kavresthali, Nepal

Type of Project

 IPP / BOOT

Period

 Construction : 1.2 years (15 months)

 Operation     : 25 years

Type of Plant

 Solar Power Plant

Installed Capacity

 49MW

Proposed Tariff

 NRs 12 (with subsidy)

 NRs 17 (without subsidy)

Performance

 117.76 GW/year

  6.5 Hours/day

IRR

 14 %

Project Cost

 Total Cost :       112,314,431 USD

 Cost Per MW :     2,292,131 USD

MOU

​​​​© 2015 by Hubicon. Created with Hubicon

CONNECT WITH US:

  • facebook-square
  • Twitter Square
bottom of page