Bhote Koshi HydroPower Project #5
Name
Bhote Koshi-5 Hydropower Project
Location
Nepal, Sindhupalchowk District (Bhote Koshi River)
Capacity
60MW
Generation
374.694GWh
Cost
USD 81,378,000
Civil Work
Diversion Flow Channel-241mL , Slope 1:500 (Trapezoidal Channel)
Full supply Level-EL 919.2m
Siphon Intake Pond-25mL x 20mW x 8mH
Siphon-122mL x 4mW x 4mH(box type)
Intake Portal-80mL x 20mW(Bell mouth type)
Headrace Tunnel-7.6km x Φ5.6mD
(Shape : Horse shoe, Shotcrete and Concrete)
Surge Shaft-Φ15mD x 47mH(Underground circular)
Penstock Tunnel-Φ5. 0mD x 48mL
Penstock-Φ3. 7mD x 285.1mL(Exposed Steel Penstock)
Powerhouse-30mL x 19mW x 35mH(Surface)
Tailrace Tunnel-55mL x 5mW x 5mH (Box Canal)
Electro Mechanical Equipment
Turbine-30MW x 2sets (Francis Vertical)
Install Capacity-60MW
Energy Generated-374.694GWh/year
Transmission Line-4km
(132kV Single Circuit to Sun Koshi HEP Substation)
Layout






FIRR Equity-35.49% for 20 Operation years
Benefit / Cost Ratio-1.598
Construction of Civil and E&M Works Period-3.5 Years
License and License Renewal Fee


License and License Renewal Fee